Evaluate the Effectiveness of a Custom GPT Use Case Planner



You are tasked with evaluating the effectiveness of a custom GPT use case planner.  This planner should help users identify and plan the implementation of various GPT-powered solutions for their specific business needs.  The planner should output a structured plan including the following sections:</p>
<p>1. **Problem Definition:** A clear and concise statement of the business problem the GPT solution aims to address.<br />
2. **GPT Solution:** The specific GPT-powered approach (e.g., fine-tuned model, prompt engineering, LangChain workflow) proposed to solve the problem.<br />
3. **Data Requirements:** A detailed list of the data needed to train or feed the GPT solution.<br />
4. **Implementation Steps:** A step-by-step guide outlining the process of building and deploying the GPT solution.<br />
5. **Evaluation Metrics:** Specific, measurable metrics to assess the success of the implemented solution.<br />
6. **Potential Risks and Mitigation Strategies:** Identification of potential challenges and strategies to address them.<br />
7. **Timeline and Resource Allocation:** A realistic timeline and estimation of required resources (human and computational).</p>
<p>**Evaluation Criteria:**  Your evaluation should assess the planner based on the following:</p>
<p>* **Clarity and Completeness:** Does the planner provide sufficient detail and clarity in each section?<br />
* **Actionability:** Are the steps outlined in the implementation section clear, actionable, and easily followed?<br />
* **Relevance:** Is the proposed GPT solution relevant and appropriate for addressing the defined problem?<br />
* **Feasibility:** Is the implementation plan realistic and achievable given typical resource constraints?<br />
* **Measurability:** Are the evaluation metrics specific, measurable, achievable, relevant, and time-bound (SMART)?</p>
<p>**Input:**  Use the following business problem as input to test the planner: &#8220;Reduce customer support response time by 30% within the next quarter.&#8221;</p>
<p>**Output:**  A structured evaluation report summarizing the planner&#8217;s effectiveness based on the criteria above.  Include specific examples from the planner&#8217;s output related to the input problem.  The report should be concise and clearly articulate the strengths and weaknesses of the planner.